Get a consultation

Heat generating company “Biogeneration-M”

Project: Design and modernization of the boiler of the city heating boiler house DKVR 10/14 in water heating mode 5 GKal

Fuel: Wood chips, sunflower husks

Equipment: Burner PKP 9,5 MWt

    Consultation with a specialist

    Manufacturing type
    Coolant
    Fuel
    Power, Steam capacity, mW t/hour
    1
    5
    10
    15
    20
    25
    30