Get a consultation

“Altyn Shigiz” company

Project: Supply of equipment and Installation of the production boiler room of the oil extraction plant based on three KE 25/24 boilers

Fuel: Sunflower husk, coal

Equipment: Burner PVG (a)-3500 15 MWt, generator TLK 18

    Consultation with a specialist

    Manufacturing type
    Coolant
    Fuel
    Power, Steam capacity, mW t/hour
    1
    5
    10
    15
    20
    25
    30