Company “Kozak Astyk”
Project: Supply of equipment and Installation of the production boiler room of the oil extraction plant based on three KE 25/24 boilers
Fuel: Sunflower husks, coal
Equipment: Burner PVG (a)-3500 20 MWt, generator TLK 18
Project: Supply of equipment and Installation of the production boiler room of the oil extraction plant based on three KE 25/24 boilers
Fuel: Sunflower husks, coal
Equipment: Burner PVG (a)-3500 20 MWt, generator TLK 18