Get a consultation

“SHP GROUP” EOOD for AO MAY

Project: Supply of equipment for a 10 MWt gas boiler house

Fuel: Sunflower husks

Equipment: Swirl burner automated PVG(a)-3500 10 MWt, Steam boiler E-10.0-1.4 BIO

    Consultation with a specialist

    Manufacturing type
    Coolant
    Fuel
    Power, Steam capacity, mW t/hour
    1
    5
    10
    15
    20
    25
    30