2 LLC “AGRO BUSINESS VIP”
Project: supply and installation of a heat-generating complex with a capacity of 10 MW and a grain dryer SSh-65
Fuel: pellets, category 3 agro-waste
Equipment: TGT 10 MW
Project: Modernization of grain drying complex DSP-50 2 pcs. for the use of solid biofuels to replace the consumption of liquid heating oil
Fuel: Granulated sunflower husk, waste from the elevator
Equipment: Heat generator – 2 pcs. TGT-4,5-PV(a) 4,5 MW
Project: Modernization of the grain drying complex DSP-50 for the use of solid biofuels to replace natural gas consumption
Fuel: Sunflower husk
Equipment: TGT-6,0-PV(a) 6,0 MW heat generator
Project: Modernization of the grain drying complex М819 for the use of solid biofuels to replace natural gas consumption
Fuel: Sunflower husks
Equipment: Heat generator TGT -3,5- PV(a) 3,5 MWt
Project: Modernization of grain drying complex DSP -25 for the use of solid biofuels to replace the consumption of natural gas
Fuel: Granulated sunflower husk, wood pellets, straw
Equipment: Heat generator TGT -3,0-PGV(a) 3,0 MWt
Project: Modernization of grain drying complex А1- DSP -50 for the use of solid biofuels to replace the consumption of natural gas
Fuel: Agricultural processing waste
Equipment: Heat generator TGT -6,0- PGV(a) 6,0 MWt
Project: Modernization of grain drying complex for the use of solid biofuels to replace the consumption of natural gas
Fuel: Wood chips, sunflower husk
Equipment: Heat generator TGT – 6,0 – PGV(a) 6,0 MWt with heat exchanger 4,5 MWt
Project: Modernization of the pulp drying drum А2 PSA 3,5х20
Fuel: Granulated sunflower husk
Equipment: Burner PGV(a)-3500 21 MWt
Project: Design of an oil extraction plant with a capacity of 500 tons per day for sunflower seeds
Fuel: Sunflower husk, Sunflower husk granulated
Equipment: Swirl burner PV-3500 8 MWt – 2 pcs