Get a consultation

«ASTEN» LLC Dnipropetrovsk region

Project: Modernization of the steam boiler room. Delivery and installation of the boiler KE 4-14 complete with burner device PV(a)-3500 for the use of solid biofuel to replace the consumption of natural gas.

Fuel: Sunflower husks

Equipment: Burner PV(a) -3500 8,0 MWt

Project: Е-10/14-285 boiler modernization for use of solid biofuels for the purpose replacement of coal consumption

Fuel: sunflower husks

Equipment: Burner PVG (a) -3500 8,0 MWt

Project: Boiler modernization DKVr-10/13 for use of solid biofuels for the purpose replacement of coal consumption

Fuel: Wood pellets, wood chips

Equipment: Burner PGV (a) -3500 8,0 MWt

Project: Construction of a steam boiler room of an oil press plant

Fuel: Sunflower husks

Equipment: Burner PGV (a) -3500 6,0 MWt

Project: Modernization of the boiler DKVR -10/13 for the use of solid biofuel in order to replace the consumption of natural gas.

Fuel: Wood pellets, wood chips

Equipment: Burner PGV (a) -3500 8,0 MWt

Project: Construction of a new one boiler rooms based on the boiler DKVR -10-13 for the use of solid biofuel to replace coal consumption

Fuel: Sunflower husks

Equipment: Burner PVG (a) -3500 8,0 MWt

Project: Modernization of the Avogadro SB-16-1.4-285 boiler to increase the efficiency of burning solid biofuel with the aim of increasing steam productivity.

Fuel: Sunflower husks

Equipment: Burner PVG (a) -3500 12,0 MWt

Project: Modernization of the boiler DKVR -6.5/13 for the use of solid biofuel in order to replace the consumption of natural gas

Fuel: Loose granulated sunflower, Wood pellets

Equipment: Burner PVG (a) -3500 6,0 MWt

Project: Construction of a steam boiler room of an oil press plant.

Fuel: Sunflower husks

Equipment: Burner PVG (a) – 3500 3,5 MWt – 2 шт

    Consultation with a specialist

    Manufacturing type
    Coolant
    Fuel
    Power, Steam capacity, mW t/hour
    1
    5
    10
    15
    20
    25
    30