PJSC “Pologiv OEZ”

Project: Modernization of the boiler DKVR -20/13 for the use of solid biofuel in order to replace the consumption of natural gas.

Fuel: Sunflower husks

Equipment: Burner PVG (a) – 3500 15,0 MWt

Project: Modernization of the boiler DKVR -20/13 for the use of solid biofuel in order to replace the consumption of natural gas.

Fuel: Sunflower husks

Equipment: Burner PV(a) -3500 13,0 MWt

Project: Installation of a steam boiler productivity of 24 t / year

Fuel: Sunflower husks and pellets

Equipment: Burner PVG (a) – 3500 8.0 MW – 3 pcs

Project: boiler modernization. DKVR-6,5-13 for use of solid biofuels for the purpose replacement of coal consumption

Fuel: Sunflower husk

Equipment: burner PVG (a) -3500 6.0 MW -2pcs

Project: Technical engineering design, installation of boiler room and sunflower processing plant equipment

Fuel: Sunflower husks

Equipment: Burner PV (a)-3500 3МВт

Project: design and nstallation of a steam boiler productivity of 30 t / year

Fuel: Husks and pellets sunflower husks

Equipment: burner PVG (a) -3500 12MW – 2 pcs

Project: Boiler modernization DKVR -10

Fuel: Granulated sunflower husk

Equipment: Burner PVG (a) 3500 8 MWt

Project: Boiler plant’s modernization

Fuel: Sunflower husk, granulated sunflower husk

Equipment: Swirl Burner PVG (a) -3500 5,0 MWt

Project: Construction of a steam boiler room on solid fuel

Fuel: Sunflower husk, granulated sunflower husk

Equipment: Burner PVG (a) -3500 20 MWt