PJSC “Pologiv OEZ”
Project: Modernization of the boiler DKVR -20/13 for the use of solid biofuel in order to replace the consumption of natural gas.
Fuel: Sunflower husks
Equipment: Burner PVG (a) – 3500 15,0 MWt
Project: Modernization of the boiler DKVR -20/13 for the use of solid biofuel in order to replace the consumption of natural gas.
Fuel: Sunflower husks
Equipment: Burner PV(a) -3500 13,0 MWt
Project: Installation of a steam boiler productivity of 24 t / year
Fuel: Sunflower husks and pellets
Equipment: Burner PVG (a) – 3500 8.0 MW – 3 pcs
Project: boiler modernization. DKVR-6,5-13 for use of solid biofuels for the purpose replacement of coal consumption
Fuel: Sunflower husk
Equipment: burner PVG (a) -3500 6.0 MW -2pcs
Project: Technical engineering design, installation of boiler room and sunflower processing plant equipment
Fuel: Sunflower husks
Equipment: Burner PV (a)-3500 3МВт
Project: design and nstallation of a steam boiler productivity of 30 t / year
Fuel: Husks and pellets sunflower husks
Equipment: burner PVG (a) -3500 12MW – 2 pcs
Project: Boiler modernization DKVR -10
Fuel: Granulated sunflower husk
Equipment: Burner PVG (a) 3500 8 MWt
Project: Boiler plant’s modernization
Fuel: Sunflower husk, granulated sunflower husk
Equipment: Swirl Burner PVG (a) -3500 5,0 MWt
Project: Construction of a steam boiler room on solid fuel
Fuel: Sunflower husk, granulated sunflower husk
Equipment: Burner PVG (a) -3500 20 MWt