MEZ LLC “POTOKY”

Project: Supply of equipment and installation of the boiler room, 2nd phase.

Fuel: Sunflower husks and husk pellets

Equipment: Burner PVG (a)–3500, 12 MWt

Project: Supply of equipment and Installation of the production boiler room of the oil extraction plant based on three KE 25/24 boilers

Fuel: Sunflower husk, coal

Equipment: Burner PVG (a)-3500 15 MWt, generator TLK 18

Project: Supply of boiler room equipment

Fuel: Pellet

Equipment: Boilers KE-4 Burner PV (a)-3500 3.5 MWt – 2 pcs

Project: Supply of boiler room equipment

Fuel: Pellet

Equipment: Boiler KE-25 Burner PVG (a)–3500 12 MWt

Project: Supply of economizer blocks for the E-35-40-440D boiler

Fuel: Sunflower husks, agricultural crop cleaning waste

Equipment: 2 p.

Project: Supply of steam boiler KE-25.0-1.4

Fuel: Peleta, alcohol bard

Equipment: Boiler KE-25.0-1.4

Project: Supply of PVG(a)-3500 8.0 MW burner and boiler room components

Fuel: Pellet, alcohol bard

Equipment: Burner PVG (a)-3500 8 MWt

Project: Development of a steam boiler room Boiler KE-10-14 Thermal capacity 6.0 MW. Steam productivity 8 t/h.

Fuel: Sunflower husks is granular

Equipment: Boiler KE-10-14-370. Burner PVG -6 MWt

Project: Supply, chief installation and commissioning of boiler equipment of 8 MW. Swirl burner 6 MWt

Fuel: Sunflower husk is granulated, bard is alcoholic

Equipment: Burner PVG (a)-3500 16.0 MWt